• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Wednesday, June 24, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

APP

Power restored to over 1.2 million flood victims: Power Division

Published on: September 4, 2025 4:39 AM

The Ministry of Energy (Power Division) on Wednesday reported substantial progress in restoring electricity across flood-affected regions, with 222 feeders fully restored and 127 temporarily energized out of 487 impacted.

According to the Power Division’s latest report, restoration work is underway at full pace in affected areas under various distribution companies (DISCOs), with a significant number of feeders and grid stations already restored.

Peshawar Electric Supply Company (PESCO), Gujranwala Electric Power Company (GEPCO), Lahore Electric Supply Company (LESCO), Faisalabad Electric Supply Company (FESCO), Multan Electric Power Company (MEPCO), Tribal Electric Supply Company (TESCO), and Hazara Electric Supply Company (HAZECO) have resumed partial or full operations, with Swabi and D.I. Khan fully restored and other areas expected to recover within days.

In PESCO-managed areas including Swat, Buner, Shangla, Swabi and D.I. Khan, 12 grid stations and 91 feeders were impacted by the floods. Out of these, 85 feeders have been fully restored while six have been partially restored. As a result, electricity has been restored to 459,921 out of 463,375 affected consumers. Restoration work for the remaining 3,454 consumers is expected to be completed between September 4 and 11. Complete restoration has already been achieved in Swabi and D.I. Khan.

In GEPCO’s jurisdiction, 11 grid stations and 103 feeders were affected. Out of these, 83 feeders have been fully restored while 13 have been partially restored, enabling the restoration of power supply to 631,495 out of 735,995 affected consumers. Restoration for the remaining 104,500 consumers will be carried out as soon as floodwater recedes.

In LESCO-controlled areas including Lahore, Okara, Sheikhupura, Kasur, and Nankana Sahib, 67 feeders were affected. Among them, 31 feeders have been fully restored and 36 partially restored. As a result, power has been restored to 59,590 out of 75,681 affected consumers. Restoration work for the remaining 16,091 consumers is expected to be completed between September 4 and 5.

Similarly, in FESCO’s areas covering Toba Tek Singh, Faisalabad, Chiniot, Jhang, Sargodha, Mianwali, and D.I. Khan – 26 grid stations and 76 feeders were impacted. Of these, 18 feeders have been fully restored and 54 partially restored, restoring electricity to 83,185 out of 194,344 affected consumers. Restoration for the remaining 111,159 consumers is also expected to be completed by September 5.

In MEPCO’s domain, 134 feeders were affected, impacting 88,818 consumers. Restoration work in these areas will commence immediately after floodwater recedes.

In TESCO areas, particularly in North Waziristan and Khyber, 13 feeders were affected. So far, two feeders have been fully restored and 9 partially restored, enabling the restoration of power to 9,072 out of 25,433 consumers. The remaining 16,361 consumers are expected to have their electricity restored by 5:00 PM on September 5.

Meanwhile, in HAZECO’s Mansehra region, all three affected feeders have been fully restored.

In total, across all affected regions, 49 grid stations and 487 feeders were impacted. So far, 222 feeders have been fully restored and 127 feeders temporarily restored, allowing electricity restoration to 1,266,928 out of 1,607,311 affected consumers.

The Power Division reiterated that complete restoration of electricity in flood-hit areas remains a top priority.

Filed Under: Pakistan

Submit a Comment




Primary Sidebar




Latest News

Islamabad’s H-9 Sunday Bazaar

Fire at Islamabad’s H-9 Sunday Bazaar Destroys 335 Shops and Stalls

Masoud Pezeshkian Pakistan visit

Iranian President Masoud Pezeshkian Concludes One-Day Visit to Pakistan

Karachi Imam Bargah vehicle crash

Karachi Imam Bargah Incident Declared an Accident by Police

Rubio seeks Gulf support for Iran deal

Memon praises PPP electoral victory

Pakistan

Islamabad’s H-9 Sunday Bazaar

Fire at Islamabad’s H-9 Sunday Bazaar Destroys 335 Shops and Stalls

Masoud Pezeshkian Pakistan visit

Iranian President Masoud Pezeshkian Concludes One-Day Visit to Pakistan

Karachi Imam Bargah vehicle crash

Karachi Imam Bargah Incident Declared an Accident by Police

Memon praises PPP electoral victory

Pakistan supports Hormuz free navigation

More Posts from this Category

Business

Gold sees massive Rs10,000 decline in Pakistan

New gas wells start production in Sindh

Pakistan and Iran strengthen partnership for regional peace

K-Electric grants Ashura relief with power and payment ease

Pakistan eyes economic gains after key mediation role

More Posts from this Category

World

Rubio seeks Gulf support for Iran deal

Iran-US technical talks conclude in Switzerland

Israel smuggled Starlink into Iran: Bennett

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}