• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Friday, June 5, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

Web Desk

Second unit of Neelum-Jhelum Hydropower producing up to maximum capacity

Published on: June 20, 2018 10:58 AM

LAHORE: Second unit of Neelum-Jhelum hydroelectric power project on Tuesday started generating power to its maximum capacity of 242.42 megawatts (MW).

The power plant is now working up to its optimum point and is transmitting power to the national grid.

As per the contractual requirement, the plant will be on a three-day reliability test run which would later turn into a 30-day test. However, the plant will be generating power to its maximum capacity.

The Neelum-Jhelum power plant’s fourth unit was earlier put into operation in April which added 1.3 million units of electricity into the system during the test run.

The first unit was put on a reliability test run for 30-days on May 18 which was successfully cleared. The plant generated its maximum capacity of 242.25 MW with additional 200 million units into the system.

The first unit will be taken over by WAPDA after it will be shut down for minor adjustments.

Former Prime Minister (PM) Shahid Khaqan Abbasi on April 13 had officially inaugurated the first unit of Neelum-Jhelum Hydropower project, an engineering marvel in Muzaffarabad.

Neelum-Jhelum project is considered to be an engineering wonder as it is planned underground in a mountainous area that may reap an estimated annual benefit of Rs 55 billion. The plan covers three main components of a dam, water-way system consisting of 52 kilometer (KM) long tunnels and an underground power house.

The project will also be providing low-priced hydel-power worth five-billion to the National Grid annually.

Pakistan Water and Power Development Authority (WAPDA) has been implementing a joint strategy for optimal consumption of water and hydro-power resources. The strategy focuses on fast completion of projects under construction and initiation of new water and hydropower projects to be completed in shortest possible time.

WAPDA has been making efforts to grant contracts for Mohmand Dam and Diamer-Basha Dam within a year. The grants for both the dams will assist in making up for water storage and hydropower generation capacities are expected to increase immensely.

The Neelum-Jhelum project commenced in January 2008 for diversion of Neelum waters through tunnels constructed at Nauseri about 41 km from Muzaffarabad. The outfall for Jhelum River and its powerhouse are located in Chatter Kalas Muzaffarabad. The project holds the capacity to generate 5150 Giga Watts per hour (GWh) that is 5.15 billion units annually.

Filed Under: Pakistan Tagged With: Headline, Neelum-Jhelum, power generation, WAPDA

Submit a Comment




Primary Sidebar




Latest News

Trump legal team blocks BBC request in $10bn lawsuit

Xi to visit North Korea as China seeks closer ties

President, Prime Minister praise forces after anti-terror operations in KP

Gilgit-Baltistan election campaign reaches final stretch

Pakistan, Iran discuss stronger border security cooperation

Pakistan

President, Prime Minister praise forces after anti-terror operations in KP

Gilgit-Baltistan election campaign reaches final stretch

Pakistan, Iran discuss stronger border security cooperation

Pakistan raised concerns over India’s proposed water infrastructure projects on Chenab River

Maryam Nawaz reaffirmed her govt’s commitment to environmental protection

More Posts from this Category

Business

Oil falls on hopes of broader peace after Lebanon, Israel halt fighting

Meat exports grow by 4.16%

SBP-held foreign reserves rise by $43m to $17.9bn

Gold prices up by Rs 1,523 per tola

Rupee strengthens against dollar

More Posts from this Category

World

Trump legal team blocks BBC request in $10bn lawsuit

Xi to visit North Korea as China seeks closer ties

No sign of progress in US-Iran talks as Hezbollah rejects truce

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.