• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Friday, June 5, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

APP

CPEC energy projects generate 46,000 job opportunities

Published on: October 5, 2022 9:40 AM

Some 46,500 Pakistanis have been employed so far in the energy projects (completed and under-construction) under the umbrella of China Pakistan Economic Corridor (CPEC). Considering the various economic fissures prevailing in Pakistan (i.e, inequitable underdevelopment, low energy access, low human capital, and accompanying low productivity), the CPEC power plants have performed commendably in raising overall direct local employment (46,500) throughout Pakistan, said a report titled “Overview of Pakistan’s Power Sector and its Future Outlook” recently published by China Three Gorges International.

The report said the overall socioeconomic demographic of around 46 thousand families have been raised, while thus skilled work force enjoys on-site training by both local and international professionals that professional work environment far surpasses the sort they would receive while employed with other local projects. It said all CPEC power plants have been installed under GOP Policy 2002, 2015, and AEDB Policy 2006 and 2019 as Independent Power Producers (IPPs) and are purely Foreign Direct Investment (FDI). All equity and private debt have been arranged by respective project companies. These plants’ total investment (Equity plus private debt) have been arranged in US dollars and directly transferred by Chinese banks (China EXIM Bank, China Development Bank, etc.) to Pakistan. The Coal based CPEC projects are based on super-critical coal technology. The prevailing engineering graduate skill-set was insufficient to meet the requirements for technical personnel. As a result, Chinese management began focusing on the employment of graduates from specific universities in Pakistan.

The first batches were completely hired from the NED University of Engineering and Technology, Karachi, and the National University of Sciences and Technology (NUST) Islamabad. Six hundred young and dynamic engineers were selected and sent to China for a 6-month technical and management training. They returned to the project site after finishing training sessions to take charge of important operation work. The engineering employees, soon after recruitment, were sent to China for 6 months for technical training to complete a module program specifically designed for the operational phase of these power plants. Currently, foreign workers are mostly employed in the maintenance department and have an exit window from the Pakistani work force market of three years, the report added.

It said as per the vision and direction of the company’s leadership, the share of Pakistani work force will be 80 percent from the current 68 percent within the next five years. Moreover, plants will be completely (100 percent) operated by the Pakistani workforce in next decade. It is evident from the survey that the foreign workers employed in this phase will return-back to their country within 5-10 years due to the length of their contracts as well as continuous human resource development as practice on the site itself. Keeping this in mind, an advantageous approach adopted for hiring the workforce in this phase consisted of a policy requiring that all domestic workers are freshly-qualified engineers from numerous engineering universities within Pakistan.

In addition, new advanced technical training institutes are planned to open within the premises to provide technical training free of cost for the domestic workers e.g. collaboration of China Three Gorges South Asia Investment Ltd (CSAIL) with local government for the establishment of Technical Training School for locals.

Filed Under: Business

Submit a Comment




Primary Sidebar




Latest News

Security forces eliminate six terrorists in Panjgur operation

Pakistan dealt injury blow ahead of Pro Hockey League

Lahore Police tightens social media rules for uniformed officers

Satirical ‘Cockroach Party’ plans protest in New Delhi

Naqvi urges joint SCO action against regional security threats

Pakistan

Security forces eliminate six terrorists in Panjgur operation

Lahore Police tightens social media rules for uniformed officers

Naqvi urges joint SCO action against regional security threats

AJK sets July 27 date for general elections

Two sons of tribal leader killed in Waziristan shooting

More Posts from this Category

Business

Weekly inflation eases as prices of some essentials decline

Federal budget proposes funding for Karachi development projects

Gold prices recorded a modest decline across Pakistan

Oil falls on hopes of broader peace after Lebanon, Israel halt fighting

Meat exports grow by 4.16%

More Posts from this Category

World

Satirical ‘Cockroach Party’ plans protest in New Delhi

Traditional Turkish coffee seller becomes a tourist attraction in Istanbul

UP madrasa demolished amid renewed scrutiny of Muslim institutions

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.