• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Monday, June 8, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

AFP

NASA scrubs launch of giant Moon rocket, may try again Friday

Published on: August 31, 2022 7:51 AM

NASA has scrubbed a test flight of its powerful new rocket, in a setback to its plan to send humans back to the Moon and eventually to Mars, but may shoot for another launch attempt on Friday.

“We don’t launch until it’s right,” NASA administrator Bill Nelson said after an engine issue forced a cancellation of Monday’s flight from the Kennedy Space Center in Florida.

“This is a very complicated machine,” Nelson said. “You don’t want to light the candle until it’s ready to go.”

The goal of the mission, baptized Artemis 1 after the twin sister of Apollo, is to test the 322-foot (98-meter) Space Launch System (SLS) rocket and Orion crew capsule that sits on top.

The mission is uncrewed — mannequins equipped with sensors are standing in for astronauts and will record acceleration, vibration and radiation levels.

Mike Sarafin, mission manager of Artemis 1, said the space agency is hoping to make another launch attempt later this week. “Friday is definitely in play,” Sarafin said.

NASA would have a better idea of whether a Friday launch is feasible after a meeting on Tuesday of the management team, he said.

“We just need a little bit of time to look at the data,” Sarafin said.

Next Monday, September 5, is an alternative launch date.

Blastoff had been planned for 8:33 am (1233 GMT) but was cancelled because a test to get one of the rocket’s four RS-25 engines to the proper temperature range for launch was not successful.

Delays are “part of the space business,” Nelson said, expressing confidence NASA engineers will “get it fixed and then we’ll fly.”

Tens of thousands of people — including US Vice President Kamala Harris — had gathered to watch the launch, which comes 50 years after Apollo 17 astronauts last set foot on the Moon.

“Our commitment to the Artemis Program remains firm, and we will return to the Moon,” Harris tweeted.

Veteran NASA astronaut Stan Love told reporters he was disappointed but “not really surprised.”

“This is a brand new vehicle,” Love said. “It has a million parts. All of them have to work perfectly.”

Overnight operations to fill the orange-and-white rocket with ultra-cold liquid hydrogen and oxygen were briefly delayed by a risk of lightning.

A potential leak was detected during the filling of the main stage with hydrogen, causing a pause. After tests, the flow resumed.

NASA engineers later detected the engine temperature problem and decided to scrub the launch.

The Orion capsule is to orbit the Moon to see if the vessel is safe for people in the near future. At some point, Artemis aims to put a woman and a person of color on the Moon for the first time.

During the 42-day trip, Orion will follow an elliptical course around the Moon, coming within 60 miles (100 kilometers) at its closest approach and 40,000 miles at its farthest — the deepest into space by a craft designed to carry humans.

One of the main objectives is to test the capsule’s heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth’s atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) — roughly half as hot as the Sun.

NASA is expected to spend $93 billion between 2012 and 2025 on the Artemis program, which is already years behind schedule, at a cost of $4.1 billion per launch.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

And since humans have already visited the Moon, Artemis has its sights set on another lofty goal: a crewed mission to Mars.

The Artemis program aims to establish a lasting human presence on the Moon with an orbiting space station known as Gateway and a base on the surface. Gateway would serve as a staging and refueling station for a voyage to the Red Planet that would take a minimum of several months.

Filed Under: Reviews

Submit a Comment




Primary Sidebar




Latest News

PFF president hails national men’s team for ending 64-year wait

Maryam Nawaz unveils major Lahore urban renewal project

UoR earns NTC thumbs-up, sets new benchmarks in technology education

US weighs Iranian assets plan as Gulf tensions rise

Punjab shifts to digital land ownership system from July

Pakistan

Maryam Nawaz unveils major Lahore urban renewal project

UoR earns NTC thumbs-up, sets new benchmarks in technology education

Punjab shifts to digital land ownership system from July

Bilawal calls urgent PPP meeting over AJK tensions

Punjab launches QR panic button system for transport safety upgrade

More Posts from this Category

Business

Pakistan savings rate hits 30-year low raising economic concerns

PSX new IPOs deliver 47% average return, boosting investor confidence

Pakistan signs MoU with Saudi, local firms to develop Karachi maritime business district

Gold prices witness sharp decline

Gul Ahmed venture QGDC announces $230m investment to set up Pakistan’s largest data centre

More Posts from this Category

World

US weighs Iranian assets plan as Gulf tensions rise

King Charles signals unity as royals gather at wedding

Pakistan tells un Kashmir dispute remains unresolved integral issue

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.