• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Friday, June 5, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi
Shahab Omer

Shahab Omer

The writer is Staff Reporter, Daily Times. He can be reached at [email protected] and tweets @shahab_omer

WAPDA to increase storage capacity of Hub Dam

Published on: August 16, 2018 2:50 AM

LAHORE: In order to meet the increasing requirement of water supply, especially in Sindh and Baluchistan, the Water and Power Development Authority (WAPDA) has decided to enhance the storage capacity of the Hub Dam, Daily Times learnt on Wednesday.

According to the details, WAPDA would regain Hub Dam’s lost storage capacity of about 49,000 acre feet by removing the sediment deposits in the reservoir which have been deposited over the passage of time. The present live storage capacity of the reservoir will be increased by excavating the deposited material lying between the Dead Storage Level (276 feet) and Normal Conservation Level (339 feet), along the reservoir periphery.

The Hub Dam Project was constructed in 1981 across River Hub, which is almost 56 kilometres North-East of Karachi. The project was designed to supply 102 million gallon per day (MGD) to Sindh and 59 MGD to Baluchistan. At the time of its completion, live water storage capacity of the Hub Dam was 760,000 acre feet, which has been reduced to 646,000 acre feet over time.

While talking exclusively to Daily Times, the WAPDA’s General Manager (Projects) South, Naeem Arif said, “This Dam was constructed in 1981 and like other dams, with time its storage capacity has decreased, as the demand has increased overtime. At present we are supplying 102 million gallons of water to Karachi and 59 million gallons to Baluchistan but as soon as the shortage is faced we reduce the supply of water. We are trying to achieve the target of 49000 acre feet so it keeps the supply of water available and on the same ratio for next 80 days in both Karachi and Baluchistan”.

He further added that the required approvals from the authorities were taken and the process of developing the PC-1 would start soon. After the approval of PC-1 within 6 to 12 months, WAPDA would be able to achieve the set target.

Asking about the delays in the rehabilitation of the Hub Dam, Naeem Arif said, “It has been 37 years that the rehabilitation of the dam was not planned, but still it is not too late and we can manage it and achieve the target. We have started working on this project but there is rapid shortage of water in Karachi with every passing day. We are also receiving several complaints from Lasbela in Baluchistan about shortage and less supply of water. Once we start storing this water, we will overcome the water shortage in all these areas.”

Neeem Arif further added that along with the enhancement of the project, WAPDA was planning to introduce the hydro-power concept as well. “This dam has the potential to generate hydro electricity. We have a fall available of approximately 65 feet which is created when the water goes into the canal from the dam. We plan to utilize this as it would generate 1.4 megawatts of energy by installing two generating units of 0.7 MW each, with annual energy generation of 5.85 million units of electricity. By implementing this concept, WAPDA would be able to provide electricity in the nearby area in the cheapest form. A feasibility study, detailed engineering design and tender documents for the same are being prepared,” Naeem concluded.

Published in Daily Times, August 16th 2018.

Filed Under: Punjab

Submit a Comment




Primary Sidebar




Latest News

Satirical ‘Cockroach Party’ plans protest in New Delhi

Naqvi urges joint SCO action against regional security threats

Traditional Turkish coffee seller becomes a tourist attraction in Istanbul

UP madrasa demolished amid renewed scrutiny of Muslim institutions

AJK sets July 27 date for general elections

Pakistan

Naqvi urges joint SCO action against regional security threats

AJK sets July 27 date for general elections

Two sons of tribal leader killed in Waziristan shooting

President, Prime Minister praise forces after anti-terror operations in KP

Gilgit-Baltistan election campaign reaches final stretch

More Posts from this Category

Business

Weekly inflation eases as prices of some essentials decline

Federal budget proposes funding for Karachi development projects

Gold prices recorded a modest decline across Pakistan

Oil falls on hopes of broader peace after Lebanon, Israel halt fighting

Meat exports grow by 4.16%

More Posts from this Category

World

Satirical ‘Cockroach Party’ plans protest in New Delhi

Traditional Turkish coffee seller becomes a tourist attraction in Istanbul

UP madrasa demolished amid renewed scrutiny of Muslim institutions

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.