• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Monday, June 8, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

Staff Report

Pakistan Railways invites EOI to enhance trains’ speed up to 160km/h

Published on: April 8, 2017 3:07 AM

KARACHI: Travel time will be improved significantly as Pakistan Railways (PR) has decided to upgrade its existing tracks to achieve speeds of up-to 120/160 Km/h with axle load of 25/30 tones.

Currently, the maximum speed of trains on most railway lines is 110 km/h while broad gauge track axle load limit is 22.86 tones.

In this regard, PR has invited Expression of Interest (EOI) for prequalification of contractors/firms/consortiums for up-gradation/rehabilitation/construction of existing track.

The PR will rehabilitate/ upgrade/ construct the sections on a build-operate-transfer (BOT) basis which is a form of project financing, wherein a private entity receives a concession from the private or public sector to finance, design, construct, and operate a facility stated in the concession contract. The construction of new track and rehabilitation/improvement of existing track is desired to be carried out to achieve higher speeds of upto 120/160 Km/h for which feasibility studies of some of the above sections are being conducted / revalidated by the nominated consultants, PR said.

The work include; laying of track from Gwadar-Talar Pass-Turbat- Hoshab-Panjgur- Besima Surab Mastung (901 km) and Jacobabad – Besima (300 Km) on BOT basis, laying of railway track from Bostan – Zhob- D.I Khan- Kotla Jam (560 km) on BOT basis, laying of track from Havelian- Khunjrab (682 km) on BOT basis.

Upgradation of existing Main Line -II (ML-II) from Kotri to Attock city (1254

kms) on BOT basis, rehabilitation/upgradation of railway track from Quetta – Taftan (680 kms) on BOT basis.

Laying of new track from Islamabad to Muzaffarabad via Murree (107 Km) on BOT basis, up-gradation of Wazirabad-Sialkot-Narowal-Shahdara (234 Km) on BOT basis.Construction of double line from Shahdara to Faisalabad via Sangla Hill and up-gradation of existing line (135 Km) on BOT basis, construction of double line from Khanewal to Faisalabad and Sangla Hill to Wazirabad (280 Km) and upgradation of existing line on BOT basis. Upgradation of track from Rohri to Quetta via Sibi including realignment of Bolan Pass ( 384 km) on BOT basis, rehabilitation/ up-gradation of Nowshera-Dargai (65 Km) and laying of new line from Dargai to Mansehra about (172 Km) on BOT basis.

PR said in order to meet the transportation demand of imported coal for coal fired power plants, to be built in Sindh & Punjab and the anticipated traffic to emerge after establishment of China-Pakistan Economic Corridor (CPEC), the existing infrastructure needs to be substantially improved, up-graded and expanded. In order to enhance the capacity and productivity of the system, the sectional speed is proposed to be raised to 120/160 KMPH by rehabilitation of complete infrastructure including track profile with flatter grades and easy curves along with latest signaling system to suit the design speed.

Filed Under: Business

Submit a Comment




Primary Sidebar




Latest News

PFF president hails national men’s team for ending 64-year wait

Maryam Nawaz unveils major Lahore urban renewal project

UoR earns NTC thumbs-up, sets new benchmarks in technology education

US weighs Iranian assets plan as Gulf tensions rise

Punjab shifts to digital land ownership system from July

Pakistan

Maryam Nawaz unveils major Lahore urban renewal project

UoR earns NTC thumbs-up, sets new benchmarks in technology education

Punjab shifts to digital land ownership system from July

Bilawal calls urgent PPP meeting over AJK tensions

Punjab launches QR panic button system for transport safety upgrade

More Posts from this Category

Business

Pakistan savings rate hits 30-year low raising economic concerns

PSX new IPOs deliver 47% average return, boosting investor confidence

Pakistan signs MoU with Saudi, local firms to develop Karachi maritime business district

Gold prices witness sharp decline

Gul Ahmed venture QGDC announces $230m investment to set up Pakistan’s largest data centre

More Posts from this Category

World

US weighs Iranian assets plan as Gulf tensions rise

King Charles signals unity as royals gather at wedding

Pakistan tells un Kashmir dispute remains unresolved integral issue

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.