Sir: Turbat is the second largest city of Balochistan. Unfortunately, it is deprived of several fundamental necessities. Among the various problems being faced by the Turbat, our road (Zubaida Jalal Road) that goes to Nasirabad, Tump and Mand is totally broken cause serious problem to travellers. The beat up condition of Zubaida Jalal Road is difficult to move. Moreover, bridge at Kech river which is a part of CPEC, has damaged many times and is still under-construction has caused many accidents as many vehicles has slipped into river. Apart from this, bridge near Neheng River in Tump is still uncompleted. This bridge was built in 1990 and washed away in floods. I request to concerned authorities to complete Zubaida Jalal Road for smooth travelling IMRAN FAZAL Turbat Published in Daily Times, August 9th 2017.