• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Tuesday, June 16, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

Abrar Hamza  

The author is a financial journalist based in Karachi and a member of the staff. He tweets @abrarhamza and can be reached at [email protected]

‘Construction work on Diamer-Bhasha site not likely to begin in 2019’

Published on: December 13, 2018 2:20 AM

Industry analysts do not foresee any major construction activity on the Diamer Bhasha project site over the next 12 months citing lack of existing funds, land issues, unavailability of international financing and current project status.

Recently, Water and Power Development Authority (WAPDA) has claimed to commence construction work on Mohmand and Diamer Bhasha dams from February-2019 and May-2019, respectively.

“However, given the water stressed situation, we do expect construction of 6 large scale dams to commence over the next 5 years which would create an additional annual demand of 1.7-2.6 million tons of cement per year”, said Farheen Irfan, an analyst at Elixir Research Department.

This is not the first time the government officials have claimed to be commencing the construction of the project. In fact, ground breaking ceremony for the dam has already happened five times in the past, with the first one being conducted by the then President Pervez Musharraf in 2006.

“Based on our assessment of project status, discussions with General Electric (one of the E&M equipment manufacturers of Hydropower Plants) and study of project timelines/milestones for Dasu Hydropower Project; we believe that civil works related to Diamer Bhasha Dam and attached hydropower plant would not begin in 2019″, said Ms Irfan.

The biggest challenges are lack of availability of funds, expected delays in private land acquisition (out of 18.3000 acres of private land, 10.2000 acres still needs to be acquired) and absence of final award for E&M equipment and civil works, she added.”We believe that the displacement of people, construction of project colony and development of model village at Harpan Das, Thak Das and Sagachal Das would be the prime project activities during 2019 – which will however not result in any meaningful impact on cement offtakes”.

Due to recent devaluation in Pakistani Rupee, the revised cost for dam estimated at Rs 530 billion (local/foreign: Rs 320bn/210bn).

Donations raised so far sum to a paltry Rs 8.5 billion (3% of the local cost component) while even after FY19 PSDP allocation, the funds set aside make up to just 10% of the local cost.

With government already facing unprecedented strains on its fiscal accounts, it appears unlikely that we will see any meaningful increase in allocations from development expenditure towards the dam over FY19-20, Ms Farheen opined.

Raising funds/debt for foreign cost component ($1.5bn) would be an even bigger challenge – part of which can be achieved via a likely issuance of Diaspora Bonds over the next 3-6 months, she concluded.

Published in Daily Times, December 13th 2018.

Filed Under: Business

Submit a Comment




Primary Sidebar




Latest News

PSX extends rally on policy stability and oil price decline

Iranian ships resume passage through Strait of Hormuz

South African jazz legend Abdullah Ibrahim dies at 91

Sooryavanshi loses temper during Sri Lanka A match

Bangladesh protests questioning of PM adviser in India

Pakistan

Aurangzeb sees economic upside after US-Iran deal

Asim Munir Nobel Peace Prize hashtag trends on X

Punjab to unveil Rs5.3 trillion budget today

SBP maintains policy rate at 11.5% as inflation fears subside

Pakistan to host Geneva ceremony for US-Iran peace accord this Friday

More Posts from this Category

Business

Finmin sees stronger growth, lower inflation amid easing global tensions

Karachi Port surpasses 2,000 vessel calls after nearly eight years

Gold prices surge by Rs 10,800 per tola

Rupee almost remains stable against dollar

PSX rallies by over 4,600 points on US-Iran deal announcement

More Posts from this Category

World

Iranian ships resume passage through Strait of Hormuz

Bangladesh protests questioning of PM adviser in India

B-52 Stratofortress bomber crashed kills eight during test flight

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.