• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Tuesday, June 16, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

Agencies

12 MW approved for New Gwadar International Airport

Published on: June 7, 2023 9:07 AM

In a groundbreaking development, approximately “12 MW” of electricity has been approved for New Gwadar International Airport (NGIA) to fulfil all its electricity needs for 24 hours without any interruption.

On special directives of the Ministry of Planning, Quetta Electric Supply Company (QESCO), National Power Distribution Company that deals with the power supply system in Baluchistan, has formally sanctioned 12 MW to energize New Gwadar International Airport (NGIA) and has commenced full-scale execution by deputing its special teams on the site.

QESCO official told Gwadar Pro that tenting and commissioning process is likely to be completed within 10 days as all required paraphernalia like poll erections, transmission lines, and electrical input and output circuits have already been aligned with the installed power system. To keep power supply smooth and free from power breakdown, 12 MW will remain available to NGIA round the clock as three power transmission lines will be feeding NGIA. “It means if one goes out of function then the second will be automatically connected and if the second goes haywire then the third will be present in the system as a backup arrangement,” he added

Explaining the three power transmission lines, he said: “One power supply is coming from a 286-kilometre long, 132kV dual-circuit transmission line through Naal-Basima-Naag-Panjgur, the second is coming from the Mund-Pishin-Turbat transmission line to Gwadar Grid Station and the third comes from the Gabd-Remden power transmission line to Jiwini-Gwadar Grid Station.”

With the completion of the electrification process, NGIA is expected to be welcoming national and international flights in the mid of September this year, marking a new era of the modern airway that will connect the world with Gwadar. Gwadar Development Authority (GDA) official told Gwadar Pro that the entire scope of work of New Gwadar International Airport including civil work, structural work, mechanical work and engineering work (except navigational & communication work) is almost complete. Under-constructed New Gwadar International Airport is located 26km northeast of the existing airport in Gwadar City on the south-western Arabian Sea coast of the Balochistan region.

The New Gwadar International Airport project kicked off as an early harvest high-priority project of the CPEC programme in 2014.

Filed Under: Business

Submit a Comment




Primary Sidebar




Latest News

PSX extends rally on policy stability and oil price decline

Iranian ships resume passage through Strait of Hormuz

South African jazz legend Abdullah Ibrahim dies at 91

Sooryavanshi loses temper during Sri Lanka A match

Bangladesh protests questioning of PM adviser in India

Pakistan

Aurangzeb sees economic upside after US-Iran deal

Asim Munir Nobel Peace Prize hashtag trends on X

Punjab to unveil Rs5.3 trillion budget today

SBP maintains policy rate at 11.5% as inflation fears subside

Pakistan to host Geneva ceremony for US-Iran peace accord this Friday

More Posts from this Category

Business

Finmin sees stronger growth, lower inflation amid easing global tensions

Karachi Port surpasses 2,000 vessel calls after nearly eight years

Gold prices surge by Rs 10,800 per tola

Rupee almost remains stable against dollar

PSX rallies by over 4,600 points on US-Iran deal announcement

More Posts from this Category

World

Iranian ships resume passage through Strait of Hormuz

Bangladesh protests questioning of PM adviser in India

B-52 Stratofortress bomber crashed kills eight during test flight

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.