• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Saturday, July 11, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • FIFA World Cup
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

APP

Local Thar-coal based electricity generation to jump to 1,320 MW: Khurram Dastgir

Published on: October 11, 2022 9:00 PM

Local Thar-coal based electricity generation to jump to 1,320 MW
Local Thar-coal based electricity generation to jump to 1,320 MW

ISLAMABAD: Local Thar-coal-based electricity generation to jump to 1,320 MW in December,Minister for Energy Khurram Dastgir Khan on Tuesday said that total electricity generation from local Thar coal would jump to 1,320 MW with addition of 330 MW .

Addressing a press conference here, the minister said that Prime Minister Shehbaz Sharif, the other day, formally inaugurated 330 MW HUBCO Thar Coal Power Plant which increased the electricity generation to 990 MW from local Thar coal. He said the people had started getting dividends of projects launched by Muhammad Nawaz Sharif in 2014.

As many as 660 MW electricity had already been supplied to the National grid since 2019 through local Thar coal, he added.

The minister said that another 1,320 MW Shanghi Electric Thar Coal Power Project under China-Pakistan Economic Corridor (CPEC) would start generation before the next summer which would help double electricity generation to 2640 MW.

He said Thar coal reserves were a blessing for the entire country, adding that as per initial estimate, the reserves stood 175 billion metric tons. The Thar coal reserves spread an area of over 100 square kilometers and had been divided into 13 blocks, he said. The minister said currently out of total 13 blocks, only two blocks were opened. Presently, three power plants with an accumulative capacity of 990 MW had been operationalized on local Thar coal, he added.

He said the coal price at the international market had surged to $ 400 per ton, while Thar coal would be available at only $ 40 per ton. Thar coal-based power plants would also help reduce the cost of electricity, he added.

He said Thar coal power plants projects were the best example of public-private partnership in the country. Special attention was also being paid that the coal-based power projects have not any effects on the environment, he added.

He said as per the technical study, 20 percent of Thar Coal could also be used in already set-up coal power plants including Sahiwal and Port Qasim. The coal could also be used for getting diesel besides in cement and fertilizers industries, he added.

He said Thar Coal would fulfill the energy requirements of the country. Khurram said the PM had already approved a project to link IslamKot (Tehsil in Thar district) to Hyderabad through the railway track in the next 6 months. It would play a key role in the effective transportation of coal in the country through railways, he added.

Replying to a question, he said a transmission line had already been laid to evacuate 2,640 MW electricity from Thar coal-based power projects. However, work was being carried out to lay new transmission lines for evacuation of power from future projects, he added.

To another question, the minister said that cost of electricity had decreased after shutting down of all expensive power plants with the decline of electricity demand and change in weather. Relief was being passed on the consumers and only 22 paisa per unit fuel cost adjustment was charged in the current month’s billing as compared to Rs 9.89 per unit in June.

He said the average cost of electricity would also decrease with the increase of share of electricity from Thar coal blocks.

 

 

Filed Under: Pakistan Tagged With: 320 MW, Latest, Local Thar-coal based electricity generation to jump to 1

Submit a Comment




Primary Sidebar




Latest News

Madonna releases new edition of fresh record ‘Confessions II’

50 Cent reacts as his P Diddy documentary earns three Emmy nominations

Adnan Sami releases four musical tributes dedicated to Ayatollah Khamenei

Will there be a ‘Crazy Rich Asians’ sequel?

Sinner beats Djokovic to set up Wimbledon final vs Zverev

Pakistan

17 more killed in Balochistan anti-terror purge

Pakistan scrambles to salvage peace memo as Trump reiterates Iran ceasefire is ‘over’

Govt raises petrol, diesel prices by over Rs 13 per litre

GB’s uplift tops government’s to-do list, says PM

More K2 wreckage recovered, search for missing crew continues

More Posts from this Category

Business

World Bank approves $376m to boost Pakistan’s electricity grid

Thar Block II: SECMC prepares for Phase III expansion

Pakistan signs LoI with Plug and Play to strengthen startup ecosystem

Rupee marginally up against dollar

Gold prices decline by Rs 1,400 per tola

More Posts from this Category

World

Israeli drones strike Lebanon despite US-brokered framework deal

Global oil production recovers as Hormuz shipments resume, IEA says

Bangladesh’s Hasina plans December return with party colleagues to surrender

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}