• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Sunday, June 7, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

Kaleem Haider Bhatti

<em>The writer can be reached at [email protected]</em>

Pakistan has no dams and it seems that no one gives a damn

Published on: June 27, 2018 12:44 AM

Pakistan is on the verge of a mass drought, and will run out of water by the year 2025, as per a report released by the Pakistan Council of Research in Water Resources (PCRWR).  Another damning report by the International Monetary Fund (IMF) has placed Pakistan on the third place in a list of countries facing a severe water shortage. According to the National Assembly Committee on Climate Change, the per capita availability of water has gone down to only 865 cubic meters, and recently the World Bank’s dismissal of Pakistan’s claims over the Kishanganga Hydroelectric Plant created by India have further exacerbated problems.

The people are angry that no solutions were presented before, and water scarcity in the country was allowed to reach such dire levels. The subsequent governments failed to do anything to curb this unmitigated disaster. The relevant authorities in charge of our water resources have remained relatively dead since the Tarbela Dam project over 48 years ago. At the time of the Indus Water Treaty, it was predicted that Pakistan would need to make one dam a year in order to tackle its water problem. However, we have not even come close to achieving that aim, and today we save only 10 percent of our water, when compared to the standard 40 percent for most countries around the world.

A UN-led ‘Save water, save Pakistan’ forum in 2012 proposed the immediate construction of Munda Dam, Akhori Dam, Kurram Tangi Dam and Kalabagh Dam. However, Kalabagh Dam (KBD) has been subject to intense debate ever since it was first proposed.

The dam has a lot of advantages, specifically due to its location, as well as its capacity to store over 6.5 million-acre feet (MAF) of water and generate 3600 megawatts (MW) of electricity. However, the debate has become politicised, with individuals opposing it for their own personal gain, rather than presenting adequate arguments against its construction. The government and the chairman of WAPDA have constantly stated that no decision on KBD can be taken unless there is consensus between the different provinces, yet this should not stop them from exploring alternate solutions. If they keep waiting for the provincial governments to compromise on KBD, then our water problems and India’s control over our water supply will continue unabated.

Water scarcity is fast becoming the biggest problem Pakistan is facing today, and it is an issue that needs the complete attention of the state.

As far as alternates go, the Akhori Dam is the preferred option. It has a gross storage limit of 7.6 MAF and will cost $4.4 billion, which is about $1.5 billion less than KBD’s estimated cost of construction. The Skardu/Katzarah Dam also promises to be a viable solution, with a capacity of 27 MAF and the ability to generate 15,000 MW of electricity; however, its best feature is its projected lifespan of over a thousand years. The only drawback to this dam is its estimated cost, which is approximately around $15 Billion, and the project is currently slated for a preliminary study from WAPDA by 2025.

While megadams were common in the past, countries have now been turning to smaller dams to fulfil their needs. China recently proposed 40 new environment-friendly small gravity dams. Although their price tag will be almost twice the amount KBD would cost, their capacity for electricity generation will be 14 times more.The recent construction of one such dam at Chashma should be monitored in order to gauge the effectiveness of these dams.

A decrease in the gross storage capacity is commonly a result of the accumulation of sediment particles in the reservoir. The storage capacity of both Tarbela and Mangla dams is estimated to shrink 33 percent by 2020 due to continuous sedimentation. The storage capacity of Tarbela dam has dropped to about 6.6 MAF, with Mangla performing similarly. As per the UNDP, if a dam were to be built upstream or downstream from Tarbela, this accumulation of sediments can be avoided, which is why the Executive Committee of the National Economic Council recently approved the construction of Bhasha Dam.

Water scarcity is fast becoming the biggest problem Pakistan is facing today, and it is an issue that needs the complete attention of the state. If the authorities in charge want to avoid seeing the whole country turn in to a large desert, it is time they put their petty differences aside, and find viable solutions for the future progress of the nation.

The writer can be reached at [email protected]

Published in Daily Times, June 27th 2018.

Filed Under: Perspectives

Submit a Comment




Primary Sidebar




Latest News

Mirra Andreeva wins French Open to claim first Grand Slam title

Antonelli pips Verstappen to Monaco pole

Iran World Cup squad heads to Mexico as US visa row erupts

Bosnia’s World Cup pursuit begins at a home-away-from home in the American Midwest

Football fans urge red card for coach who led Israeli club

Pakistan

All set for Gilgit-Baltistan Elections today

Mohsin Naqvi arrives in Tehran as Pakistan pushes for US-Iran deal

Lebanon army chief visits US-Iran mediator Pakistan

US strikes Iranian sites after Iran launches drones, in latest Gulf flare-up

72 held in AJK crackdown as government defends JAAC ban

More Posts from this Category

Business

PSX new IPOs deliver 47% average return, boosting investor confidence

Pakistan signs MoU with Saudi, local firms to develop Karachi maritime business district

Gold prices witness sharp decline

Gul Ahmed venture QGDC announces $230m investment to set up Pakistan’s largest data centre

SECP takes action against 36 government entities

More Posts from this Category

World

Trump claims Iran missile stockpile shrinking

Young ‘cockroaches’ hold first protest in New Delhi

Ukraine strikes key Russian military sites

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.