Muzaffargarh Thermal Power Station:

Author:

The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.

Share
Leave a Comment

Recent Posts

  • Op-Ed

We Are Ashamed, My Quaid (Part II)

The American author John Maxwell has nicely advised leaders, “You must be big enough to…

4 hours ago
  • Op-Ed

Exploring the Spirit of Adventure

As cheers of spectators reverberate, Ravi Jeep Rally becomes more than just a sporting event…

5 hours ago
  • Pakistan

PIA Operations Resume Smoothly in United Arab Emirates

In a welcome development for travelers, flights operated by Pakistan International Airlines (PIA) in the…

9 hours ago
  • Business

RemoteWell, Godaam Technologies and Digitt+ present Top Ideas at Zar Zaraat agri-startup competition

“Agriculture, as a sector, hold the key to prosperity, food security, and the socioeconomic upliftment…

10 hours ago
  • Editorial

Wheat Woes

Months after a witty, holier-than-thou, jack-of-all-trades caretaker government retreated from the executive, repeated horrors from…

15 hours ago
  • Editorial

Modi’s Tricks

For all those hoping to see matured Pak-India relations enter a new chapter of normalisation,…

15 hours ago