The bridge over the seasonal Nullah Nuakhat Rajbah is lying badly damaged and unrepaired due to the alleged slackness of the officials of the Irrigation Department and alleged funds paucity.
The bridge over Naullah Naukhar Bramch Tajbah near Paiyaanwali-Bambaanwala in Daska tehsil, was badly damaged and its one portion was eroded and washed away during flash flooda.
This bridge is the only way to connect the dozens of the Daska villages with each other.
Since then, the bridge was lying badly damaged and unrepaired due to alleged slackness of concerned officials of the Daska irrigation department.
The local people were suffering from great difficulties while passing through this damaged bridge which was old and in shambles as well and was in very miserable condition.
When contacted, the officials of Daska Irrigation Department said that they had no funds for the repairing of this damaged bridge due to which the bridge was lying unrepaired.
Local people have expressed grave concern over this critical situation and they have urged the Punjab Chief Minister Sardar Usman Buzdar, Commissioner Gujranwala Division Zulfiqar Ghuman and Sialkot Deputy Commissioner Tahir Farooq to look into the matter in the larger public interest before the coming rainy and flood season.
When international labor community was observing International Labour Day, scores of illiterate laborers in Pakistan…
A delegation of Pakistani elite youth which recently visited Urumqi, Kashgar, and Atush said that…
A delegation comprised over 15 participants from the Economic Cooperation Organization Science Foundation (ECOSF) including…
The Committee on Science and Technology of the Organization of Islamic Cooperation (COMSTECH) has partnered…
A cross-firing between two rival groups on Model Town Link Raod claimed the life of…
A woman with the help of her lover kidnapped her own son in Narowal, police…
Leave a Comment