SOPs issued for Orange Line Metro train

Author: Web Desk

Preparation of SOPs to run Orange Line Metro train in view of Corona virus

Narunco ​​International Regional Manager Lee Chen, Director Ahsan Fayyaz Meets Secretary Primary and Secondary Health Care Capt (R) Muhammad Usman

Detailed discussion on SOPs for training of staff operating the Orange Line Metro train

Li Chen also requested that detailed SOPS be prepared for the four-month training. Li Chen also requested that detailed SOPS be prepared for the four-month training

All trains are equipped with modern technology, it is not impossible to run a train without training.Secretary Primary and Secondary Health Care directs to convene special meeting of Technical Working Group

Orange Line Metro Train is an important project, training of staff to run the train is of utmost importance. Detailed SOPs will be issued for staff training.Coronavirus prevention is top priority, SOPs will do everything possible to help implement sectors.

Share
Leave a Comment

Recent Posts

  • Business

Cotton arrival in Pakistan slumps sharply in December 2024

Cotton arrival in Pakistan registered a significant decline of 33% as of December 31, 2024,…

3 hours ago
  • Business

PSX stays bullish, gains 545 more points

The 100-Index of the Pakistan Stock Exchange (PSX) continued with bullish trend on Wednesday, gaining…

3 hours ago
  • Business

Rupee gains 8 paisa against dollar

Pakistani rupee on Friday appreciated by 8 paisa against the US dollar in the interbank…

3 hours ago
  • Business

Gold rates increase by Rs.2,200 per tola

The price of 24 karat per tola gold increased by Rs.2,200 and was traded at…

3 hours ago
  • Business

CDNS achieves Rs 700 bln savings target

The Central Directorate of National Savings (CDNS) has realized a target of Rs 700 billion…

3 hours ago
  • Business

Panel of experts to scrutinize quality of imported wheat

KP Minister for Food Zahir Toru has said that the provincial government has constituted a…

3 hours ago