80% work of Gwadar East Bay Expressway complete: Bajwa

Author: APP

Special Assistant to the Prime Minister on Information and Broadcasting Lt. Gen (retd) Asim Saleem Bajwa on Friday said about 80 percent work on the Gwadar East Bay Expressway had been completed.

Asim Bajwa who is also Chairman of the CPEC Authority, in a tweet, also shared some pictures of the expressway showing asphalt work underway on the road. He said the expressway would help boost the port operations. It would prove to be the main artery of Gwadar Port through which the entire traffic of port would flow. The East-bay Expressway would also provide connectivity of the Gwadar seaport and its Free Zone with the network of National Highways to ensure fast transportation of import, export and transit goods.

Gwadar port is being developed by China and is part of the mega project of China-Pakistan Economic Corridor (CPEC). Currently, the Gwadar deep sea port is connected through a narrow 16 feet wide thoroughfare of Gwadar Town at the West-Bay. All the trawlers, trucks loaded with imported shipments pass through this strip causing disruption of normal traffic.

The port has not a dedicated wide highway to cater the transporting requirements of the post.

The port operationalization, even with the available three multi-purpose berths, necessitates construction of the planned East-Bay Expressway. This 6-lane expressway along with a provision of 30 meters wide railway corridor will connect the port with the Mekran Coastal Highway (N-20) through the 2300 acres Free Trade Zone of Gwadar Port.

Share
Leave a Comment

Recent Posts

  • Top Stories

Senior executives at Mercuria to face investigation by Pakistan’s FIA

Mercuria, a global commodities trading firm headquartered in Geneva, finds its senior executives under scrutiny…

20 hours ago
  • Business

PSX extends bullish trend with gain of 862 points

Pakistan Stock Exchange (PSX) remained bullish for the second session in a row on Monday,…

21 hours ago
  • Business

PKR depreciates by 3 paisas to 278.24 vs USD

The rupee remained on the back foot against the US dollar in the interbank market…

21 hours ago
  • Business

SECP approves PIA’s scheme of arrangement

The Securities and Exchange Commission of Pakistan has approved the Scheme of Arrangement between Pakistan…

21 hours ago
  • Business

Gold snaps losing streak

Gold price in the country snapped a six-session losing streak and increased by Rs2,500 per…

21 hours ago
  • Business

Rs 83.6 billion loaned to young entrepreneurs: Rana Mashhood

Chairman of the Prime Minister Youth’s Programme(PMYP) Rana Mashhood has underscored the success of the…

21 hours ago