Sarfraz miffed by skewed scheduling

Author: Agencies

DUBAI: Pakistan captain Sarfraz Ahmed hasn’t taken the Asia Cup scheduling too kindly, given it will leave his team travelling back and forth from Abu Dhabi to Dubai for the Super Four stage of the Asia Cup. This will also be the case for Afghanistan and Bangladesh, while India have been exempted from the 90-minute trip. As per the rules, the team that finishes second in Group A will play their first Super Four game in Abu Dhabi. However, a late tweak has been made by the organisers to ensure India will continue to be based in Dubai, irrespective of where they finish in the pool. “If you talk about the pool, India remain here even if they lose,” Sarfraz said. “Travelling is an issue. If you travel for one-and-a-half hour during matches, then it’s tough. In this weather, it is tough because after one day you play another game. I think it should be even for all the teams, whether it’s India or Pakistan. If there are matches in Abu Dhabi, then every team has to play there. I don’t know what the Asian Cricket Council has done about it.”

Published in Daily Times, September 19th 2018.

Share
Leave a Comment

Recent Posts

  • Business

BMP for lowering production cost to promote industrialization, enhance exports

The Federation of Pakistan Chambers of Commerce and Industry’s (FPCCI) Businessmen Panel (BMP) has called…

10 hours ago
  • Business

‘Govt should withstand resistance to broadening tax base’

The tax evaders and black economy mafia bosses are putting a strong resistance to the…

10 hours ago
  • Business

PFC to take part in Riyadh Intel expo

Pakistan Furniture Council (PFC) will take part in a 3-day Riyadh international expo starting from…

10 hours ago
  • Business

PPL Adhi Field’s operational parameters, safety protocols inspected

Chairman of Oil and Gas Regulatory Authority (OGRA) Masroor Khan, along with Mr. Zain-ul-Abideen Qureshi…

10 hours ago
  • Business

Tarbela 5th Extension Hydropower project to supply 1.347 bln units annually

Tarbela 5th Extension Hydropower Project will supply 1.347 billion low-cost and environment-friendly units annually to…

10 hours ago
  • Business

KP exporters demand incentives over export of goods to Afghanistan, CAR in Pak currency

All Khyber Pakhtunkhwa Exporters Association has demanded of government to announce incentives over exporting of…

10 hours ago