Contract for 5th expansion of Tarbela hydropower plant signed

Author: inp

A consortium consisting of China North Water Engineering Group and its local Pakistani partner, MMP Company has signed a consultancy contract with the Water and Power Development Authority (WAPDA) for the fifth phase of the Tarbela Hydropower Plant expansion project, Gwadar Pro reported on Friday.

Construction of the plant began in 1968, and it started storing water and generating electricity in 1976.

The Tarbela complex has multiple functions, including irrigation, flood control, and power generation.

It irrigates an area of 170,000 square kilometers and has a reservoir capacity of 13.7 billion cubic meters.

The dam, an earth-fill embankment with a sloping core wall, spans 2,743 meters along its crest and reaches a maximum height of 143 meters, making it the world’s largest earth-fill dam by volume.

The plant initially had an installed capacity of 2,100 megawatts (MW), which has since been expanded to 4,888 MW.

The fifth expansion of the Tarbela Hydropower Plant will convert the existing irrigation tunnel number 5 into a water diversion tunnel for power generation.

This upgrade will add 1,530 MW of capacity, increasing the plant’s total installed capacity to 6,418 MW.

This expansion marks a significant achievement for China North Water Engineering Group, following their previous consultancy work on the Diamer-Basha Dam in Pakistan.

It is also another major international project financed by the World Bank and the Asian Infrastructure Investment Bank (AIIB) in which the company is directly involved.

The Tarbela Hydropower Plant is located on the Indus River, at the border between the provinces of Khyber Pakhtunkhwa (KPK) and Punjab, approximately 64 kilometers from Islamabad.

Share
Leave a Comment

Recent Posts

  • Pakistan

Addressing Bonded Labour and Rights Violations at Brick Kilns

On 18th September 2024, Boded Labour Liberation Front Pakistan held a seminar at Press club…

43 mins ago
  • Op-Ed

Workplace Well-being: Designing for Worker Safety and Productivity in Pakistan

Human factors and ergonomics, integral to shaping efficient and safe work environments, are critical aspects…

3 hours ago
  • Pakistan

Fazl stands in the way of constitutional amendment

Jamiat Ulema-e-Islam Fazl (JUI-F) Chief Maulana Fazlur Rehman, who took the centre stage as both…

13 hours ago
  • Pakistan

PTI links talks on tweaks to Imran’s release

Senior Pakistan Tehreek-e-Insaf (PTI) leader Ali Muhammad Khan has urged the government to release the…

13 hours ago
  • Pakistan

Russia voices support for Pakistan’s bid to join BRICS

Russian Deputy Prime Minister Alexei Overchuk stated on Wednesday that Moscow supports Pakistan's inclusion in…

13 hours ago
  • Pakistan

14 killed, hundreds wounded as new gadget explosions hit Lebanon day after pager blasts

Hand-held radios used by Lebanese armed group Hezbollah detonated on Wednesday across Lebanon's south and…

13 hours ago