CDA has clarified some social media clips regarding an isolation slip road near to Jinnah Square Interchange and said all the main structures of the Interchange and its loops are fully intact, sound and operational. A very small portion of an isolated slip has been readdressed due to water percolation in the nearby vicinity of the Sui gas trenches made for the road crossings. This was a very small point that has been addressed immediately after the heavy rainfall today with concrete by the contractor at his own cost. The prompt rectification falls under the contractor’s mandatory two-year defect liability period, ensuring all works are maintained to the highest quality and standards.